23/04/24 (Agence Europe) – In a new report on Monday 22 April, the Agency for the Cooperation of Energy Regulators (ACER) assessed the proposed methodology for gas transmission tariffs for Interconnector Limited (INT), the gas pipeline linking the United Kingdom and Belgium. The Agency considers that the information contained in INT’s consultation document is insufficient to allow a full assessment of the compliance of the proposed tariff methodology with the EU Gas Tariff Network...